Home >> Products & Services >> Electrical Systems >> Alliances
EHV Transmission Lines and Sub-stations - Alliances

(www.cymi.es)

CONTROL Y MONTAJES INDUSTRIALES S.A (CYMI)

CYMI is a wholly owned subsidiary Company of Dragados Industrial Group, a holding company that, in turn, is part of a still larger group i.e. ACS’s INDUSTRIAL SERVICES.

BTS is an Indian Business associate and exclusive partner of CYMI in India; CYMI is venturing into Extra High Voltage Transmission Lines and Substation Projects in India.

CYMI is basically an EPC contracting company specialized in Electrical Systems and is operating in the Field of Extra High Voltage Transmission Lines and Substations. It is also in the field of Instrumentation and Control, Climate Control Systems and Security Installation of Large Industries. Railway Electrifications and Air Port Installations are the other areas where also the group has its presence.

CYMI is operating all over world and has presence in Latin America, African Countries and Middle East besides Europe.

Besides EPC contracts, CYMI is also having its own Transmission Lines on Build, Own and Operate basis in countries like Mexico, Brazil, etc.

As an experienced contractor, CYMI is able to manage complete installations from Design to Procurement, Erection, Testing and Commissioning on turnkey basis and also provides post-operational assistance as well.

CYMI has qualified and experienced technical staff, which enables it to provide varied services.

CYMI has its own manufacturing facilities in an area of 3,500 sqm for Electrical Switchgears and Control Panels (L.V. and H.V.) and Systems Integration.

Services & products offered by CYMI are:

  • Overhead Transmission Lines up to 500 kV.
  • Electrical Substations up to 500 kV.
  • Industrial Electrical Instrumentation & Installations.
  • Industrial Distribution System.
  • Industrial Power and Lighting Installations.
  • Data Processing and Load Dispatch Center.
  • Control Rooms.

Some of the important Projects

TRANSMISSION LINE

EPC Project

L.T.Salto Location- Parana P.L.-525 KV, 376Km Cost-64,808 Thousand Euros
P.L. 506 Location- Mexico P.L.-400kv-2C-222km Cost-64,233 Thousand Euros
P.L.Xingo Location-Brazil P.L.-500kv, 200km Cost-41 690 Thousand Euros
SLT 709       Location-MEXICO P.L.-400kv, 302.9km Cost-37,880 Thousand Euros
Nacnogales Location-SONORA P.L.-400kv, 99km Cost-21, 784 Thousand Euros

BOOT Projects

NTE Location-Alagaos P.L.-500kv, 200km Cost-R$ 385,150 Thousand
STE Location-Macambra P.L.-230kv, 205km Cost-R$ 219,649 Thousand
ATE Location- Parana P.L.-525kv, 167km Cost-R$ 293,840 Thousand
MTE Location- Camacari P.L.-500kv, 106km Cost-R$ 96,437 Thousand
UTE Location- Parana P.L.-525kv, 120km Cost-R$ 97,149 Thousand

SUBSTATIONS

Tres Estrellas Location- Veracruz Capacity-400kv Cost-8,267 Thousand USD
Fressnal Location-Sonora Capacity-230 kv Cost-10,425 Thousand USD
Museo BCO Location-Museo Banco Capacity-115kv Cost-3,345 Thousand USD


 


@Copyright 2003 Birla Technical Services, All Rights Reserved
This site is best viewed at 800x600 resolution with
Internet Explorer 5.0 or Netscape Navigator 6.1 and greater.
Last Updated in May, 2007